4/30/2014
ds fw
Stripped forms on slab and got firewood.
_________________________
4/29/2014
ds
Poured Slab
_________________________
4/28/2014
p ds
Prepared Forms
p p
Forms for overage
___________________________
4/27/2014
ds
Cut Steel
_________________________
4/26/2024
s
The other day the excavator knocked over the saw and broke it, I had to take it apart
and weld it and put it back together,
____________________________
4/25/2014
ds
Took 8 wheelbarrows of dirt out to level slab
_______________________
4/24/2014
r
Rain Day, worked on Radio.
________________________
4/23/2014
ds
Put in Drain Field, Gutter and Electric pipe.
___________________________
4/22/2014
ds
Moved dirt
_________________________
4/21/2014
ds
Got Rock for drain field
_________________________
4/20/2014
e  e  r
Easter, Rest.
_______________________
4/19/2014
ds
Set Form for slab.
_________________________
4/18/2014
ds
Moved inside forms and got material for slab forms.
________________________
4/17/2014
ds

ds
Forms stripped
________________________
4/16/2014
ds ds
Poured Concrete, Wall finished
ds ds
East side almost done.   West side blew apart, shoveled all out and rebuilt, re-poured.
_______________________
4/15/2014
m
Madrone in Bloom
ds
Forms are Braced
________________________
4/14/2014
sw
Caught another swarm today.

ds
Inside of the form Braced
________________________
4/13/2014
ds
Inside Forms done.  Trapped a swarm of Bees.
_______________________
4/12/2014
ds
Inside form north wall up.
__________________________
4/11/2014
ds
Steel is set.
_______________________
4/10/2014
ds
Outside of the form done.
_______________________
4/09/2014
ds
Started Forms
_______________________
4/08/2014
a
Radio Class, worked on drain for Outdoor Kitchen under Slab of Dance Studio.
Apple Blossoms
________________________
4/07/2014
j
Every Day We miss you.
ds3 ds
Got material for Retaining wall form and dug up phone line and moved it.
________________________
4/06/2014
ds
Hand dug out west corner for retaining wall.
____________________________
4/05/2014
sc
Survival Class
______________________
4/04/2014
ds
Dug out the corner
_______________________
4/03/2014
sc
Getting Ready For Survival Class
________________________
4/02/2014
ds
Hand worked the hole.
________________________
4/01/2014
dzs ds
Started Work on Dance Studio