DECEMBER
______________________________________________________________________________________
12/31/2011

Cleaned and sorted type.
______________________________________________________________________________________
12/30/2011

So, Now with one inch of rain last night the top of the hill water
system is running at 64 gallons a minute!
That is a tank full in 24 minutes. The drain on the right is the
Machine shop curtain drain working nicely.

Need to clean but now I can.
_____________________________________________________________________________________
12/29/2011

Moved the press down to the shop. Want to see how I did
it? See Press Move
______________________________________________________________________________________
12/28/2011

Did more apples. Cleaned and moved 24 more drawers of type.
______________________________________________________________________________________
12/27/2011

Cleaned and moved another 24 drawers of type and one tray of borders
and stuff.
______________________________________________________________________________________
12/26/2011

Cleaned and moved 24 Fonts of type, only 50 plus more to go.
______________________________________________________________________________________
12/25/2011
Merry Christmas!


Made bullets, no powder or primer, for speed loader
practice.
______________________________________________________________________________________
12/24/2011

Got acquainted with some tools not used for years and looked for
material for same, that took hours,
found over 5000 missing units. Relieved.
_______________________________________________________________________________
12/23/2011

Put in a power line for the Compressor.
_____________________________________________________________________________________
12/22/2011
1st Day of Winter in a real winter garden.

Cabbage at 23º

Lettuce at 23º at 9:00 am.
________________________________________________________________________________________
12/21/2011

Made a J frame size holster for the SW360 SC. Went for a walk up
the trail, cold and sundown at our house is 3:00 on this day.
________________________________________________________________________________________
12/20/2011

Time to cycle some of the stores. Made bread. Pumped.

Lilly ate this holster top as a puppy 7 years ago. I repaired it
today.
_________________________________________________________________________________________
12/19/2011

Made 17 more quarts of Apple Sauce.
Happy Birthday Sharon!

Hope today is a very good day.
________________________________________________________________________________________
12/18/2011

High speed Internet up in the shops via underground cat 5.
________________________________________________________________________________________
12/17/2011

Made a Brown Left handed Holster for Karen, re-sewed the black one.
________________________________________________________________________________________
12/16/2011

Another load of wood to keep us warm in these 22º nights.
________________________________________________________________________________________
12/15/2011

Played in the Print shop and made Coaster for Brewing Company.
________________________________________________________________________________________
12/14/2011

Moved stuff, some up the hill, some down the hill.
________________________________________________________________________________________
12/13/2011

Plumbed the Foundry, Wood Shop and Machine shop for Air.
________________________________________________________________________________________
12/12/2011

Made a pattern for a K frame 2.5 inch SW. Put a latch on the tank
house door.
________________________________________________________________________________________
12/11/2011

Put new hinges on the glaze shop door so it does not drag.

Frozen fog.
___________________________________________________________________________________________________________
12/10/2011

Made bread for company. Cleaned and rested.
________________________________________________________________________________________
12/09/2011

Put apples in pantry, cleaned the bench off. Below freezing all
day, we had water.
________________________________________________________________________________________
12/08/2011

Did another load of apples and baked a loaf of bread.
_________________________________________________________________________________________
12/07/2011

Hooked up the tank at the top of the hill so it could be filled and
used, after clearing Ice from the line.

Ice crystals growing out of the ground.
____________________________________________________________________________________________
12/06/2011

Installed a wireless
Weather
Station. Wind in the center, Transmitter on the right.

Auto dumping Rain gage on the Left. LCD large indoor panel
display center and talks to 2 PC's also with record keeping.
________________________________________________________________________________________
12/05/2011

Water going into the tank house and water coming out the over flow.
____________________________________________________________________________________
12/04/2011

Got a load of wood from the other house.
________________________________________________________________________________________
12/03/2011

Cleaned the shops. Trimmed the door gap.
________________________________________________________________________________________
12/02/2011

Got the door made and up and painted, took till 5:00 pm, the paint will
dry to the same color.
________________________________________________________________________________________
12/01/2011

Did more apples.