December 2012
Go to 2011
Scroll down For this Month
________________________________
12/31/2012
Got more wood for trim, dug carrots out of the snow.
________________________________________
12/30/2012
Broccoli, cabbage and leaks dug out of the snow.
Base boards ready for carpet.
______________________________________
12/29/2012
Finished doors and trim.
________________________________________
12/28/2012
Cut Fire Wood
_______________________________________
12/27/2012
Bought Carpet for the Bed Room
______________________________________
12/26/2012
Moved stuff, reset Radio Room on the air again.
_______________________________________
12/25/2012
Christmas Day
Living room back together.
Santa brought Karen a painted living room.
______________________________________
12/20/2012 - 12/24/2012
SNOW STORM
It snowed.
And Snowed
and Snowed. NO PHONE. NO POWER. NO
INTERNET. NO TV.
Worked on staying warm.
_____________________________________
12/19/2012
Installed Lights and other small jobs
_______________________________________
12/18/2012
SIX MONTHS
Started Living Room
_______________________________________
12/17/2012
Worked on cabinets
_______________________________________
12/16/2012
New sink, faucet and plumbing.
________________________________________
12/15/2012
Painted walls, started to rebuild cabinets.
______________________________________
12/14/2012
Put up temporary chimney, re-mudded walls and painted ceiling.
________________________________________
12/13/2012
Tile grouted.
________________________________________
12/12/12
Walls have first coat of mud and tape and Tile is down
_______________________________________
12/11/2012
Floor and walls repaired and covered.
________________________________________
12/10/2012
Gutted Kitchen
_____________________________________________
12/09/2012
Dining room almost back to normal.
_______________________________________
12/08/2012
Bath is grouted and rest of the hallway is down.
___________________________________________
12/07/2012
Tile in the Bathroom is down.
________________________________________
12/06/2012
Hall and Bathroom underlayment down
________________________________________
12/05/2012
Tile grouted in dining room
_______________________________________
12/04/2012
Tile is down
Underlayment down in the Dining room
_______________________________________
12/03/2012
Dining room cleared and moved temporarily to living room.
__________________________________________
12/02/2012
Tile is grouted
_________________________________________
12/01/2012
Tile is down in the Living Room