February 2022
  Scroll down For this Month
________
2/28/2022


Bored Holes and Pressed Bearings In
________
2/27/2022
 
Clean Up, Head Stock Back Together, Set Up to Bore Holes For Bearings
________
2/26/2022

Had to take the Spindle out of the Head Stock to to put the V Belt on and
check the Bearing Height for the Transmission.  So instead of putting it back
together, I decided to Clean and Paint it,  Saving time to take it apart again.
________
2/25/2022

Hinges Done, Motor Mounted and Paint Removed from Motor Mount
________
2/24/2022
 
Reworked Motor Mount Top,  Started Hinges For Motor Mount and Pulley Transmission
________
2/23/2022
 
Worked on Transmission
________
2/22/2022

Cut Channel Pieces in Band Saw for Motor Mount and Pulley Transmission
________
2/21/2022

Rack Mounted to Bed
________
2/20/2022

Made Rack for Pinion Gear on Carriage
________
2/19/2022

Machining Scrap Brass Stock for Rack,  for Carriage travel.
________
2/18/2022

Back Clamp and Carriage Lock Installed
________
2/17/2022

Set Up to Drill Holes
________
2/16/2022

Drilled and Tapped Holes in Carriage
________
2/15/2022

Shopping, More Steel
________
2/14/2022

Made Spacer Plate and Attached Apron to Carriage
________
2/13/2022

Tapped Bed for Bolts for Back Carriage Way, Milled Slot for Front Carriage Way
________
2/12/2022

Set Up to Drill Bolt Holes in Carriage Ways
________
2/11/2022

More Work on Ways
________
2/10/2022

Started Ways for the Carriage
________
2/09/2022

Got More Steel
________
2/08/2022

Milled  0.3215  off  Pads for Back Clamp of Carriage
________
2/07/2022

Carriage, Cross Slide and Apron Cleaned
________
2/06/2022

Ways, Head Stock and Tail Turret Mounted on Lathe Bed
________
2/05/2022

V Way Rail Mounted in Slot
________
2/04/2022

Made 32.5 " of  Way that looks like this.
________
2/03/2022

Worked on Ways
________
2/02/2022

Finished Long V Block Tooling for Lathe Ways
________
2/01/2022

Started Tooling to Make Ways for Lathe