July 2019
  Scroll down For this Month
_________
7/31/2019
No Pic, Truck Repair, took down a tree.
__________
7/30/2019

Radio Class
__________
7/29/2019

Clean Up
____________
7/28/2019

South side Framed, Sheeted and Painted.
____________
7/27/2019

Painted Shed
___________
7/26/2019

Went to the Dumps
____________
7/25/2019

Roof is done
__________
7/24/2019

Radio  Class
_____________
7/23/2019
 
Freeze Block are in, All the sheeting up.
__________
7/22/2019

More work on shed.
__________
7/21/2019

More work on the Shed.
__________
7/20/2019

More work on Pottery Supply Shed
__________
7/19/2019

More work on Pottery Supply Shed
___________
7/18/2019

Got Material, and set the mud sill
___________
7/17/2019

Radio Class
___________
7/16/2019

Clean up Day
_________
7/15/2019

I'm wrecked, last pour for a while.
__________
7/14/2019

And More Concrete
__________
7/13/2019

More Concrete
_________
7/12/2019

More Concrete
____________
7/11/2019

Poured Concrete
___________
7/10/2019

Poured Concrete
__________
7/09/2019

Radio Class
__________
7/08/2019

Poured Block, made walkway form
__________
7/07/2019

Poured Concrete Walk and laid Concrete Block
___________
7/06/2019

Set Drain field behind wall, moved dirt and old concrete.
___________
7/05/2019

Poured Concrete
___________
7/04/2019

Made form for Concrete
___________
7/03/2019

Poured Concrete
___________
7/02/2019

Radio Class
__________
7/01/2019

Rest