7/30/2024 - 7/31/2024
All of The Roof Done Except The Ridge
________
7/29/2024
Half of the Roof Boards are UP
________
7/28/2024
22 Rafters Pegged in Place
________
7/27/2024
All of the Rafters Up, Some Pegged
________
7/26/2024
Some Rafters Up
________
7/25/2024
De-Barked Logs for Rafters
________
7/24/2024
Cut Stove Wood and Clean Up
________
7/23/2024
Post Cut Off, Header Set and Pegged
________
7/22/2024
Three Front Post Set
________
7/21/2024
Rest and Clean Up
________
7/20/2024
Limbed and Moved Logs down Hill, Picked up Brush
________
7/19/2024
Cut Down Dead 100ft Pine, Red Shirted Karen at The Tip
________
7/18/2024
Cut Down a 50ft Dead Dug Fir, That is the Tip End, Karen Moved Brush, Took Logs Off Hill
________
7/17/2024
Cut Down Three Trees
________
7/16/2024
Moved Sink
________
7/15/2024
Tar Paper and Roofing is Up
________
7/14/2024
All the 1 x 4's are Up
__________________
7/12/2024 - 7/13/2024
Made 1 x 4's Out of Old Fence, Put Up 8 Runs of 14
________
7/11/2024
All the Rafters Secured In Place
________
7/10/2024
All of the Rafters are Made and Up, Not All are Pinned
________
7/09/2024
2 Rafters Up In 100 + Heat
________
7/08/2024
Clean Up Day
________
7/07/2024
Pinned the Beam to the Post, and Put Up 4 of 8 Braces
________
7/06/2024
Beam is Up
________
7/05/2024
Made a Hitch Bar for Log. Moved Log to BCS. In 100 Degree Heat.
________
7/04/2024
23 Foot Log on Saw Mill
________
7/03/2024
Clean and Organized Wood Shed
________
7/02/2024
South End Post
North End Post In the
Ground
________
7/01/2024
Door Painted Inside and Out. 32 Days and Over 150 hours.