JUNE 2014

Go to 2011
Go to 2012
Go to 2013
 Scroll down For this Month
___________________
6/30/2014
ds
Started Electrical for Dance Studio
____________________
6/29/2014
t
Made a trap for a bad Squirrel
_____________________
6/28/2014
v
Day Hike to Bald Mt.

____________________________
6/27/2014
w w
Set up Auto water system for garden
_____________________
6/26/2014
p
Paper work
______________________
6/25/2014
g
Weeds Cut
___________________
6/24/2014
rig
Radio Class
_____________________
6/23/2014
fig
Pruned Frozen Dead Limbs off Fig
______________________
6/22/2014
ds
Built West Wall
_____________________
6/21/2014
rig
Worked on 4th generation of the Pups80
____________________
6/20/2014
ds
East wall up
_____________________
6/19/2014
ds
Moved Electrical Power
_____________________
6/18/2014
ds
Installed Windows
______________________
6/17/2014
d  d d
Radio Class
_____________________
6/16/14
t
View from Trail 1162
______________________
6/15/14
ct ct
Before                                                              After
Cleared Trail
___________________
6/14/14
j
Not Happy

g
Crawled on hands and knees looked up hill and down through this
______________________
6/13/14

g g
Cut paths through the trees to look for lost gun, two days
_____________________
6/12/2014
p
Pups camp
ct ct
Before                                                               After
Cleared trail
_____________________
6/11/14

spring bld
Camp set and coffee is on, water from a spring at the top of the mountain

p bld
Ready and away to Bald Mountain.
____________________
6/10/2014
pf
Packed Back Pack,  This times 8 is 8 days worth of food.  Yummy.
________________________
6/09/2014
p
Made a field strength meter, and a key.
____________________
6/08/2014
g
Sorted Gear for next Trip
______________________
6/07/2014
d
Invaded By Drone
rig
Finished Second Trail Radio
ds
Cut Window Holes
_____________________
6/06/2014
rig
Finished One Trail Radio
_____________________
6/05/2014
ds
Roof is up
____________________
6/04/2014
ds
Siding and Rafters
_______________________
6/03/2014
ds
North wall framed
______________________
6/02/2014
ds
Got Building Material
_______________________
6/01/2014
r
Worked on new Trail Radio