JUNE 2016
 Scroll down For this Month
________________
6/30/2016
lh
Got Roofing and tar paper, put up scaffold
__________________
6/29/2016
lh
East and West upper floor walls framed
_________________
6/28/2016
lh
North and South walls framed
____________________
6/27/2016
lh
Siding is on all four sides, first floor.
___________________
6/26/2016
lh
Insulate and sheet rock wall, built stairs.
_________________
6/25/2016
lh
Cut stringers for stairs

lh
Installed Hurricane Straps on all floor joist
lh
Trimmed and nailed down flooring, put up two sheets of siding
________________
6/24/2016
lh

lh
Four walls and first floor framed
___________________
6/23/2016
lh
Framed 3 walls
__________________
6/22/2016
lh
Got and unloaded material
_________________
6/21/2016
i
Radio Class
_________________
6/20/2016
ss
Poured Floor
___________________
6/19/2016
cc
Organized camping gear
_________________
6/18/2016
m
Went to Pottsville to see old motors
________________
6/17/2016
b
Cut Trees down and moved brush
_____________________
6/16/2016
wh t
Repair Water Heater, Weed whack garden
____________________
6/15/2016
ss
Graded dirt, set form, cut and set steel
_________________
6/14/2016
rc
Radio Class
___________________
6/13/2016
lcp
Poured and finished floor
_________________
6/12/2016
g
Worked in the Garden
_________________
6/11/2016
b
New Beams in place
b
Fixed Bridge
___________________
6/10/2016
lcp
Cut, set and wired steel
__________________
6/09/2016
lcp
Form set and inside graded
___________________
6/08/2016
lcp lcp
Put in Drain Field and back filled dirt

lcp
Stripped form
____________________
6/07/2016
lcp
Mixed and Poured Concrete
____________________
6/06/2016
s s
Clean up day, made soap.
____________________
6/05/2016
lcp
Inside Form is set.
____________________
6/04/2016
lcp
Back form and steel are set
____________________
6/03/2016
ss lcp
Clean up work site, moved forms to new site.
______________________
6/02/2016
ss ss
Stripped form, put in drain field
_________________
6/01/2016
ss
Poured Concrete into forms