11/30/2012
add add
54 screws per sheet,  and got 79 tile down.
________________________________________
11/29/2012
add
Cement Board is down in the Living Room
_________________________________________
11/28/2012
add
Got the cement board underlayment, 1200 lb. worth.  Rain.
___________________________________________
11/27/2012
add add
Cleared Living Room for Tile, Temporary Living Room in Bed room.
_________________________________________
11/26/2012
add add
Bedroom Painted
add
Primed
__________________________________________
11/25/2012
add add
Ready to texture on the left and textured on the right.
________________________________________
11/24/2012
add
Sanding
________________________________________
11/23/2012
add
More mud, Dixie wants to know "are you done yet?"
______________________________________
11/22/2012
add
More light fixtures.
_________________________________________
11/21/2012
add
Base boards, towel bar and shower curtain.
add add
Light fixtures up, clothes rod up.
________________________________________
11/20/2012
storm
I know the shot is blurry but I am not going out again, all work done by 9:00 am.
storm storm
Cleared the ditches and gutters.
storm storm
Rained 3.5 Inches last night, creek at flood stage had to rescue the pump.
__________________________________________
11/19/2012
add
Started to sand for the second coat of mud.
_________________________________________
11/18/2012
add
Did many small jobs today, also moved stuff into new bathroom.
________________________________________
11/17/2012
addadd
Bathroom cabinets are in.
_______________________________________
11/16/2012
addaddadd
All the tile is grouted.
_______________________________________
11/15/2012
add
All the tile set in Bath, Hall and Closet, now grout.
_________________________________________
11/14/2012
addadd
Some of the chests moved.
_______________________________________
11/13/2012
add
Carpet is in, Upstairs, Radio Room and Pantry.
_________________________________________
11/12/2012
add add
Started Tile
__________________________________________
11/11/2012
add  add
Hallway, Closet and Bath Textured and Painted

Thanks guys for all you gave.
Vets
Dad, Hank E., Marvin M., Mike E., Ron E., Tim M., Neil M.,
Dennis P., Gary  L., Brian O., and to all the veterans.
_______________________________________
11/10/2012
Thanks Mom!    Thanks Karen!
add
Second coat for the hall and closet
_______________________________________
11/09/2012
add
Started second coat of mud after sanding.
________________________________________
11/08/2012
add
did many small jobs, prepare for flashing
_______________________________________
11/07/2012
add
  Made the flashing for the chimney, cut and bent by hand.
__________________________________________
11/06/2012
add
Hall way Painted
add add
Radio Room and Pantry Painted, same paint different light bulbs.
_______________________________________
11/05/2012
carpet
Bought carpet for upstairs, pantry and radio room, 96 yards.
_______________________________________
11/04/2012
add
Radio Room walls and floor repaired ready for paint and carpet.
_________________________________________
11/03/2012
add
Painting Done, Carpet next.
_______________________________________
11/02/2012
add
Upstairs and Stairwell Primed, still wet in the corners.
________________________________________
11/01/2012
Happy Birthday Dixie 2 years old
Dixie
Good Dog!
add add
Spraying Texture                                                         Texture Done, Now Paint
add
Texture