10/31/2021

Shane watching first Print from His 3D Printer He put Together
_________
10/30/2021

Second Door Done
_________
10/29/2021

One Door Done,  Latches Next
_________
10/28/2021

Started Trim and Doors for Attic Access
_________
10/27/2021

Put Cedar Through Planer
_________
10/26/2021

Made 1"x6"x10'  Cedar Boards in Sawmill
_________
10/25/2021

Worked in Sawmill
_________
10/24/2021

Cleaned Machine Shop
_________
10/23/2021

Cleaned Wood Shop
_________
10/22/2021

Installed 12 volt Power For Kitchen Radio
_________
10/21/2021

Burned Brush Pile
_________
10/20/2021

Burned Sawdust Pile
_________
10/19/2021

Cut, Split and Stack Fire Wood
_________
10/18/2021

Cut, Split and Stack Fire Wood
_________
10/17/2021

Cut, Split and Stack Fire Wood
_________
10/16/2021

Cut, Split and Stacked More Fire Wood
_________
10/15/2021

Rest
_________
10/14/2021

Clean Up
_________
10/13/2021

Installed More Emergency Lights and Power
_________
10/12/2021

Went to Doctor
_________
10/11/2021

Went to Dentist
_________
10/10/2021

Installed More Emergency Lights
_________
10/09/2021

Cut, Split and Stacked More Wood
_________
10/08/2021

Solar Panel Controller, Battery, Fuse Block and 4 Light Circuits Installed
_________
10/07/2021
 
Cut Hole in Attic Wall to install Emergency Lighting
_________
10/06/2021

Put up Shelf in Garage, Fixed two Stuck Doors and other little stuff
_________
10/05/2021

Went to Dentist
_________
10/04/2021

_________
10/03/2021

Picked Apples
_________
10/02/2021

Cut, Split and Stacked More Wood
_________
10/01/2021

Cut, Split and Stacked Wood