September 2021

  Scroll down For this Month
________
9/30/2021


Cut down Brush in the Fire Break
________
9/29/2021

Caulked the Freeze Blocks, Put up Sheet Rock and Put up Stainless Steel Shelf
________
9/28/2021

Clean Up
________
9/27/2021

Lights Up in Garage
________
9/26/2021

Cut, Split and Stacked More Wood
________
9/25/2021

Put up some electrical outlets
________
9/24/2021

Cut, Split and Stacked Wood
________
9/23/2021

Shopping
________
9/22/2021

Trench is filled In
________
9/21/2021

Trench is dug
________
9/20/2021

More Work on Electrical in Wood Shed and Garage
________
9/19/2021

Reworked Electrical in Wood Shed
________
9/18/2021

Pressed Must into Wine
________
9/17/2021

Clean Up and Make Ready for Rain
________
9/16/2021

More Siding Up
________
9/15/2021
 
Worked on side wall of tool shed at BCS, all drilled and pegged together.
________
9/14/2021

Back Wall is Up
________
9/13/2021

Radio Day
________
9/12/2021

Put Up some Siding on the Tool Shed
________
9/11/2021

Never Forget

Siding Done for the Tool Shed, at the Bushcraft Shelter.
________
9/10/2021

Worked in Saw Mill
________
9/09/2021

Dennis at work in the Saw Mill
________
9/08/2021
 
Crushed and Stemmed Grapes and into Fermenter
________
9/07/2021

Made a Hole in Shop For Wine Fermenter
________
9/06/2021
 
Picked Grapes. Left Bucket from One Vine, 30lb.  Picked total of 117 lbs.
________
9/05/2021

Picked 100 pounds of Santa Rosa Plums and 81 pounds of Asian Pears
________
9/04/2021

Rest
________
9/03/2021

Never Ending Clean Up
________
9/02/2021

Went to see Doctor
________
9/01/2021

Moved Electrical Stuff to Sort, so I can Electrify the Garage