4/30/2014

Stripped forms on slab and got firewood.
_________________________
4/29/2014

Poured Slab
_________________________
4/28/2014

Prepared Forms

Forms for overage
___________________________
4/27/2014

Cut Steel
_________________________
4/26/2024

The other day the excavator knocked over the saw and broke it, I had to
take it apart
and weld it and put it back together,
____________________________
4/25/2014

Took 8 wheelbarrows of dirt out to level slab
_______________________
4/24/2014

Rain Day, worked on Radio.
________________________
4/23/2014

Put in Drain Field, Gutter and Electric pipe.
___________________________
4/22/2014

Moved dirt
_________________________
4/21/2014

Got Rock for drain field
_________________________
4/20/2014

Easter, Rest.
_______________________
4/19/2014

Set Form for slab.
_________________________
4/18/2014

Moved inside forms and got material for slab forms.
________________________
4/17/2014


Forms stripped
________________________
4/16/2014

Poured Concrete, Wall finished

East side almost done. West side blew apart, shoveled all
out and rebuilt, re-poured.
_______________________
4/15/2014

Madrone in Bloom

Forms are Braced
________________________
4/14/2014

Caught another swarm today.

Inside of the form Braced
________________________
4/13/2014

Inside Forms done. Trapped a swarm of Bees.
_______________________
4/12/2014

Inside form north wall up.
__________________________
4/11/2014

Steel is set.
_______________________
4/10/2014

Outside of the form done.
_______________________
4/09/2014

Started Forms
_______________________
4/08/2014

Radio Class, worked on drain for Outdoor Kitchen under Slab of Dance
Studio.
Apple Blossoms
________________________
4/07/2014

Every Day We miss you.

Got material for Retaining wall form and dug up phone line and moved it.
________________________
4/06/2014

Hand dug out west corner for retaining wall.
____________________________
4/05/2014

Survival Class
______________________
4/04/2014

Dug out the corner
_______________________
4/03/2014

Getting Ready For Survival Class
________________________
4/02/2014

Hand worked the hole.
________________________
4/01/2014

Started Work on Dance Studio