February 2014
Go to 2011
Go
to 2012
Go to 2013
Scroll down
For Today and this Month
______________________
2/28/2014

Made more Bowls
_________________________
2/27/2014

Made Wooden Bowl
________________________
2/26/2014

Installed another Gas Light
__________________________
2/25/2014

Radio Class
_______________________
2/24/2014

Installed another Gas Light
_________________________
2/23/2014

Installed two Gas Lights
__________________________
2/22/2014

Radio testing
________________________
2/21/2014

Pruned grapes
_________________________
2/20/2014

Made Pine Tar
____________________________
2/19/2014

Radio Class
_______________________
2/18/2014
Cleaned, no pic
________________________
2/17/2014

Made leather water proofing.
2 parts bees wax, 1 part linseed oil, 1 part turpentine
______________________
2/16/2014

Cleaned shops, went for walk
_________________________
2/15/2014

Got Propane
_______________________
2/14/2014

Worked on saw, electrical problems
________________________
2/13/2014

More wood
__________________________
2/12/2014

Out door kitchen BBQ
________________________
2/11/2014
went to town no pics
______________________
2/10/2014

Un-stacked Kiln and ground pots
________________________
2/09/2014

Fired Pots, Made two more floor stands
________________________
2/08/2014

Glazed Pots
________________________
2/07/2014

Cleaned the Glaze shop
________________________
2/06/2014

Worked on old wood lathe
______________________
2/05/2014


Made a new shaft for Lathe and installed it.
________________________
2/04/2014

Radio Class, Brian's Loose Coupler
______________________
2/03/2014

More wood
________________________
2/02/2014

Made a floor stand for drill press
________________________
2/1/2014

Finished tail stock