January 2022
Scroll down For
this Month
________
1/31/2022
Went to town, for material for the ways and found this Bench
________
1/30/2022
Channel Bed Ends and Bottom Rails Milled, Cleaned Paint Off Bed
________
1/29/2022
Started Milling Ends of the Lathe Bed
________
1/28/2022
Cut Channel
________
1/27/2022
Installed LED Lights in Machine Shop
________
1/26/2022
Went to Scrap Yard and Bought Aluminum Channel 10x3.5 inches
________
1/25/2022
Clean Up
________
1/24/2022
Pointer for Crank Dial Done. Rotary Table Finished
________
1/23/2022
Finished Break for Rotary Table
________
1/22/2022
Bored Hole for Break
________
1/21/2022
Machined Casting
________
1/20/2022
Clean Up
________
1/19/2022
Cast Mold, Failure, I forgot to put Vent holes in and Steam Bubbled the Aluminum Out.
________
1/18/2022
Rammed a Sand Mold For Casting Aluminum
________
1/17/2022
Added 10 lb of Water to Albany Sand, Not Right yet, let it rest Overnight, Cleaned Up Shaper
________
1/16/2022
Pattern Finished, Albany Sand Screened and Foundry Cleaned
________
1/15/2022
Found, Cut and Split 29 lbs wood for Wood Fire Furnace
________
1/14/2022
Pattern For Rotary Table Break, Needs Sanding and Paint
________
1/13/2022
Worked on Pattern for Rotary Table Break
________
1/12/2022
Attached Drill Press Filer
________
1/11/2022
Clean Up Day, Cleaned up Aluminum Stock to look for needed plate
_______
1/10/2022
Drive Sleeve, needs Set Screw
_______
1/092022
Threaded Drive Sleeve
_________
1/08/2022
Started Work on Threaded Drive Sleeve
_________
1/07/2022
Crank Wheel Finished
_________
1/06/2022
Worked on Crank Wheel
_________
1/05/2022
Started Work on Rotary Table
_________
1/04/2022
Clean up Day
_________
1/03/2022
Finished Radius/Ball Cutter for Lathe
_________
1/02/2022
Tool Post Clamps Done
_________
1/01/2022
One side of the clamps for the Tool Post is Done