6/30/2016

Got Roofing and tar paper, put up scaffold
__________________
6/29/2016

East and West upper floor walls framed
_________________
6/28/2016

North and South walls framed
____________________
6/27/2016

Siding is on all four sides, first floor.
___________________
6/26/2016

Insulate and sheet rock wall, built stairs.
_________________
6/25/2016

Cut stringers for stairs

Installed Hurricane Straps on all floor joist

Trimmed and nailed down flooring, put up two sheets of siding
________________
6/24/2016


Four walls and first floor framed
___________________
6/23/2016

Framed 3 walls
__________________
6/22/2016

Got and unloaded material
_________________
6/21/2016

Radio Class
_________________
6/20/2016

Poured Floor
___________________
6/19/2016

Organized camping gear
_________________
6/18/2016

Went to Pottsville to see old motors
________________
6/17/2016

Cut Trees down and moved brush
_____________________
6/16/2016

Repair Water Heater, Weed whack garden
____________________
6/15/2016

Graded dirt, set form, cut and set steel
_________________
6/14/2016

Radio Class
___________________
6/13/2016

Poured and finished floor
_________________
6/12/2016

Worked in the Garden
_________________
6/11/2016

New Beams in place

Fixed Bridge
___________________
6/10/2016

Cut, set and wired steel
__________________
6/09/2016

Form set and inside graded
___________________
6/08/2016

Put in Drain Field and back filled dirt

Stripped form
____________________
6/07/2016

Mixed and Poured Concrete
____________________
6/06/2016

Clean up day, made soap.
____________________
6/05/2016

Inside Form is set.
____________________
6/04/2016

Back form and steel are set
____________________
6/03/2016

Clean up work site, moved forms to new site.
______________________
6/02/2016

Stripped form, put in drain field
_________________
6/01/2016

Poured Concrete into forms