11/30/2012

54 screws per sheet, and got 79 tile down.
________________________________________
11/29/2012

Cement Board is down in the Living Room
_________________________________________
11/28/2012

Got the cement board underlayment, 1200 lb. worth. Rain.
___________________________________________
11/27/2012

Cleared Living Room for Tile, Temporary Living Room in Bed room.
_________________________________________
11/26/2012

Bedroom Painted

Primed
__________________________________________
11/25/2012

Ready to texture on the left and textured on the right.
________________________________________
11/24/2012

Sanding
________________________________________
11/23/2012

More mud, Dixie wants to know "are you done yet?"
______________________________________
11/22/2012

More light fixtures.
_________________________________________
11/21/2012

Base boards, towel bar and shower curtain.

Light fixtures up, clothes rod up.
________________________________________
11/20/2012

I know the shot is blurry but I am not going out again, all work done
by 9:00 am.

Cleared the ditches and gutters.

Rained 3.5 Inches last night, creek at flood stage had to rescue the
pump.
__________________________________________
11/19/2012

Started to sand for the second coat of mud.
_________________________________________
11/18/2012

Did many small jobs today, also moved stuff into new bathroom.
________________________________________
11/17/2012


Bathroom cabinets are in.
_______________________________________
11/16/2012



All the tile is grouted.
_______________________________________
11/15/2012

All the tile set in Bath, Hall and Closet, now grout.
_________________________________________
11/14/2012


Some of the chests moved.
_______________________________________
11/13/2012

Carpet is in, Upstairs, Radio Room and Pantry.
_________________________________________
11/12/2012

Started Tile
__________________________________________
11/11/2012

Hallway, Closet and Bath Textured and Painted
Thanks guys for all you gave.

Dad,
Hank E., Marvin M., Mike E., Ron E., Tim M., Neil M.,
Dennis P., Gary L., Brian O.,
and to all the
veterans.
_______________________________________
11/10/2012
Thanks Mom! Thanks Karen!

Second coat for the hall and closet
_______________________________________
11/09/2012

Started second coat of mud after sanding.
________________________________________
11/08/2012

did many small jobs, prepare for flashing
_______________________________________
11/07/2012

Made the flashing for the chimney, cut and bent by hand.
__________________________________________
11/06/2012

Hall way Painted

Radio Room and Pantry Painted, same paint different light bulbs.
_______________________________________
11/05/2012

Bought carpet for upstairs, pantry and radio room, 96 yards.
_______________________________________
11/04/2012

Radio Room walls and floor repaired ready for paint and carpet.
_________________________________________
11/03/2012

Painting Done, Carpet next.
_______________________________________
11/02/2012

Upstairs and Stairwell Primed, still wet in the corners.
________________________________________
11/01/2012
Happy Birthday Dixie 2 years old

Good Dog!

Spraying
Texture
Texture Done, Now Paint

Texture