September
2012
_______________________________________
09/30/2012

Install hardware on two pocket doors
________________________________________
09/29/2012

More Plums and Eggplant
_______________________________________
09/28/2012

New Pocket Door In Bedroom from Scratch.

Hillside cleared of scrap.
__________________________________________
09/27/2012

Picked up 1100 square feet of tile.
_________________________________________
09/26/2012

Put a news sheet barrier between two small colonies and merged
them maybe? We will see.

Easy Fire wood
________________________________________
09/25/2012

Started to tape and mud the sheet rock.
________________________________________
09/24/2012

Started Pocket Door
_________________________________________
09/23/2012

Cider
___________________________________
09/22/2012

Jimmy and Sharon making wine, Karen too!

Picked 540 pounds of grapes
________________________________________
09/21/2012

TP holder and Hand rail.

2012 Harvest of Butternut Squash
________________________________________
09/20/2012

Cleaned the greenhouse and now it is the drying shed, plums mmmm!
________________________________________
09/19/2012

Shower is in and working.
________________________________________
09/18/2012

Install tub and drain.
_______________________________________
09/17/2012

Fixed entrance from cement stairs.
________________________________________
09/16/2012

New Toilet in and working.
_______________________________________
09/15/2012

Bathroom sheetrocked.
________________________________________
09/14/2012

Hallway and closet rocked.
_______________________________________
09/13/2012

Insulate ceiling and walls, in hall, bathroom and closet. Sheet rock
ceiling in same.
________________________________________
09/12/2012

More sheet rock.
_________________________________________
09/11/2012
We remember.

That is a Three Inch Tomato and an Eight Inch Rutabaga.

Started sheet rock in the bedroom.
__________________________________________
09/10/2012

Bedroom insulated.
_______________________________________
09/09/2012

Bracing on south side done.
_________________________________________
09/08/2012
\
Picked eggplant and Planted some winter stuff.

Secured Bracing
_______________________________________
09/07/2012

Helped with the bar top.

Dennis made great forms.
________________________________________
09/06/2012

Sand and Gravel are ready for Bar Top.
________________________________________
09/05/2012

Master Bathroom and closet electrical in.
_________________________________________
09/04/2012

Electrical in the Bedroom
______________________________________________
09/03/2012

Framed the bathroom
_________________________________________
09/02/2012

Worked on sheet rock nailer boards in the bedroom.

Melons, Peaches, Plums, Pears and Apples.
___________________________________________
09/01/2012

Started bracing.

25 screws per brace, per side, lots of screws.